FSEIS for Hidden Cove

1.0 Impacts and Mitigation

1-COVER-AREA

2.0 Comments and Responses redline ASR

2.0 Comments and Responses

2-EXISTING'-EXISTING 1

3.0 Public Hearing Minutes

3-EXISTING'-EXISTING 2

4.0 Correspondence Received

4-EASMT-1

5.1 Structural Assessment by De Nardis Engineering LLC

5.2 Cost Estimates by CTS Group Architecture

5.3 Per Square Foot Cost Estimates for Interior Fit Out by GS Architects

5.4 Cost Estimates for Site Improvements by VHB Engineering

5.5 Appraisal by Hudson Property Advisors

5.7 Stormwater Pollution Prevention Plan

5.8 Stormwater Capacity Analysis Report

5.9 FEMA Flood Hazard Data and ABFE Map

5.10 NYS DEC NY Natural Heritage Program Correspondence

5.11 Bald Eagle Habitat Investigation

5.12 Ossining School District Correspondence

5.13 Structural Inspection for Hidden Cove Development dated 6-2-15

5.14 Structural Inspection-Enrty Shed and Buillding dated 3-10-16

5-EASMT-2

6-EASMT-3

7-UTILITY-OFFSITE UTILITIES (0-300)

8 SITEPLAN-SECTION

9-SITE PLAN UTILITIES

10-PROFILE-UTILITY

11-F-GRADING-SITE PLAN GRADING

12 SITEPLAN--PARKING

Cover Pages and Table of Contents

PD Project Description

Planning Board Ltr 4.9.18 Submission

13 SITEPLAN-STREET-2

14--LIGHT-1

15-LIGHT-2

16-F-LAYOUT-OFFSITE LAYOUT (0-300)

17-F-LAYOUT-OFFSITE LAYOUT (300-875)

18-F-LAYOUT-OFFSITE LAYOUT (875-1500)

19 -OFFSITE UTILITIES (0-300)

20 -OFFSITE UTILITIES (300-875)

21--OFFSITE UTILITIES (875-1500)

22 F-GRADING-OFFSITE GRADING (0-300)

23 F-GRADING-OFFSITE GRADING (300-875)

24 F-GRADING-OFFSITE GRADING (875-1500)

25 - TURNING MOVEMENT

26 PHASING-PHASING-1

27 PHASING-PHASING-2

28-EX_SLOPES-SLOPES

29-PR_SLOPES-DISTURBANCE

30-CUTFILL

31-CUTFILL 2

32 SITEPLAN-18-EROSION

33-DETAILS-DETAIL-1

34-DETAILS-DETAIL-2

35-DETAIL-3

ALT RD LAYOUT P